Hygienic Finishes Walls, Floors & Ceilings

Kings School - Canterbury

HygienaClad have been installing hygienic wall cladding in many different environments for many years, primarily within the healthcare and food preparation industry.

This project included all two key disciplines,Flooring which included extensive floor preparation including leveleing, Liquid DPM, latexing and finally fitting of safety flooring. Hygienic Wall cladding throughout the extensive kitchen and associated areas

Return to Main News Page.

Kings School Canterbury

We have worked on a number of projects for Kings school undertaking Wall cladding and safety flooring within the main school kitchen that sits adjacent to the magnificant cathedral and the junor school kitchen.

The main kitchen underwent a major refurbishment during the summer and HygienaClad was asked to advise and undertake the works following on from the initial work that was carried out in the previous year.
The refurbishment included a significant amount of work to get the floor to the desired finish with new gulleys and multiple levels that existed.



The works was on a tight schedule as a major function was planned at the end of the summer.
The project required a significant amount of planning and execution to fit in with the other works being executed at the same time across the two different locations.

Further to the successful completion of these projects further works have been carried out in the Kings School recreation centre.